Tenders for Construction
1) | Supply and fixing of tricolor LED strip outdoor type light for fixing on street light pole | ||||||
Reference No. | IITJ/OIE/2024-25/10 | ||||||
Date of Issue | 22-08-2024 | ||||||
Date of Due | 24-08-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
2) | Chainlink fencing work at various locations in IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2024-25/05 | ||||||
Date of Issue | 13-06-2024 | ||||||
Date of Due | 04-07-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
3) | Boundary wall work including fencing around 33 KVA main substation in Pocket-B campus of IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2024-25/04 | ||||||
Date of Issue | 12-06-2024 | ||||||
Date of Due | 03-07-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
4) | Supply, Installation, Testing & Commissioning of Hi-wall AC units at various locations, IIT JODHPUR. | ||||||
Reference No. | IITJ/OIE/2024-25/03 | ||||||
Date of Issue | 19-04-2024 | ||||||
Date of Due | 29-04-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
5) | Partition and Electrical Power supply connection work for two labs in Bay 2 of W08 Berm at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-2024/38 | ||||||
Date of Issue | 22-03-2024 | ||||||
Date of Due | 06-04-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
6) | Civil Works at Animal House | ||||||
Reference No. | IITJ/OIE/2023-24/39 | ||||||
Date of Issue | 07-03-2024 | ||||||
Date of Due | 14-03-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
7) | SITC of 33 KV VCB outdoor breaker in the 33/11 KV GSS Pocket B at IIT Jodhpur. | ||||||
Reference No. | IITJ-OIE-2023-2024-37 | ||||||
Date of Issue | 06-03-2024 | ||||||
Date of Due | 13-03-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
8) | Civil Works at Animal House | ||||||
Reference No. | IITJ/OIE/2023-24/35 | ||||||
Date of Issue | 16-02-2024 | ||||||
Date of Due | 23-02-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
9) | ARMO of Student Hostels, Faculty and Staff Housing , Academic and Administrative Buildings, Tunnel, Trenches, Sub-trenches, Roads, Berms, Sports Complex etc including internal and external services-Civil at IITJodhpur Karwar-342030 for Year 2024-25 | ||||||
Reference No. | IITJ-OIE-2023-2024-32 | ||||||
Date of Issue | 09-02-2024 | ||||||
Date of Due | 01-03-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
10) | SITC of electrical cable, earthing and AC work for Weatherometer equipment in the CRDSI Department at IIT Jodhpur. | ||||||
Reference No. | IITJ-OIE-2023-2024-34 | ||||||
Date of Issue | 09-02-2024 | ||||||
Date of Due | 19-02-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
11) | Repair and maintenance of Chiller and Cooling Tower at HVAC plant, IIT JODHPUR. | ||||||
Reference No. | IITJ-OIE-2023-24-31 | ||||||
Date of Issue | 31-01-2024 | ||||||
Date of Due | 12-02-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
12) | ARMO towards Heat Ventilation and Air Conditioning (HVAC) system, water purification system and fire fighting for IIT Jodhpur, Karwar (Pincode-342030), NH-62, Jodhpur, Rajasthan during the period from March 2024 to February 2025. | ||||||
Reference No. | IITJ/OIE/2023-24/26 | ||||||
Date of Issue | 25-01-2024 | ||||||
Date of Due | 09-02-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
13) | Supply Installation Testing and commissioning of UPS Power Supply for CCTV and Data Networking Equipment for Type B and Type C Residence at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/30 | ||||||
Date of Issue | 18-01-2024 | ||||||
Date of Due | 08-01-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
14) | SITC of electrical points, earthing works and VRF/VRV AC system for lab setup at CRDSI Department (Instrumentation Building) at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/29 | ||||||
Date of Issue | 18-01-2024 | ||||||
Date of Due | 29-01-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
15) | Supply, Installation, Testing & Commissioning of RGBW lightning on IIT Jodhpur Signage at Chanakya Complex (Admin Building) , IIT JODHPUR | ||||||
Reference No. | IITJ/OIE/2023-24/27 | ||||||
Date of Issue | 08-01-2024 | ||||||
Date of Due | 11-01-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
16) | Aluminum Partition for computer center office at 1st floor Computer Center in IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2023-24/25 | ||||||
Date of Issue | 29-12-2023 | ||||||
Date of Due | 19-01-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
17) | Aluminum Partition for ERP office at 1st floor computer centre in IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/23 | ||||||
Date of Issue | 11-12-2023 | ||||||
Date of Due | 02-01-2024 | ||||||
Corrigendum |
|
||||||
Award | |||||||
18) | Aluminium partition work at E14 & E08- berm in IIT Jodhpur | ||||||
Reference No. | IITJ-OIE-2023-24-22 | ||||||
Date of Issue | 17-11-2023 | ||||||
Date of Due | 08-12-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
19) | Alteration and modification work in office of CEP, W10(Sleep Lab), Physics room no. 108 and office of Library. | ||||||
Reference No. | IITJ/OIE/2023-24/21 | ||||||
Date of Issue | 16-11-2023 | ||||||
Date of Due | 07-12-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
20) | Annual Repair, Operation and Maintenance (ARMO) of Audio & Video system, Fire alarm system etc. from February 2024 to January 2025 at IIT Jodhpur Campus. | ||||||
Reference No. | IITJ/OIE/2023-24/20 | ||||||
Date of Issue | 10-11-2023 | ||||||
Date of Due | 01-12-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
21) | REWILDING WORK AT IIT JODHPUR (KARWAR) | ||||||
Reference No. | IITJ/OIE/RW/2023-2024/19 | ||||||
Date of Issue | 17-10-2023 | ||||||
Date of Due | 06-11-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
22) | Annual Repair, operation and Maintenance (ARMO) of Audio & Video system, Fire alarm system etc. for the year 2023-24 at IIT Jodhpur Campus | ||||||
Reference No. | IITJ/OIE/2023-2024/18 | ||||||
Date of Issue | 28-09-2023 | ||||||
Date of Due | 18-10-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
23) | Alteration and modification work in office of CEP, W10(Sleep Lab), Physics room no. 108 and Office of Library. | ||||||
Reference No. | IITJ/OIE/2023-2024/17 | ||||||
Date of Issue | 25-09-2023 | ||||||
Date of Due | 16-10-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
24) | Annual, Repair, Maintenance and Operation (A.R.M.O.) of Substation, DG sets, Electrical Installation (Internal & External) and UPS etc. for the year 2023-24 at IIT Jodhpur Campus | ||||||
Reference No. | IITJ/OIE/2023-24/16 | ||||||
Date of Issue | 20-09-2023 | ||||||
Date of Due | 10-10-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
25) | Data cabling work for computer lab furniture at Mathematics Department, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2023-24/15 | ||||||
Date of Issue | 23-08-2023 | ||||||
Date of Due | 31-08-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
26) | Supply, Installation, Testing & Commissioning of SS double braided flexible AC pipe for Hi-wall units in each room of phase ? I Hostels i.e. G-5, G-6, B-1, B-2 IIT JODHPUR | ||||||
Reference No. | IITJ/OIE/2023-24/14 | ||||||
Date of Issue | 14-08-2023 | ||||||
Date of Due | 29-08-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
27) | Provision of street light from parking to back side of Jodhpur club at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-2024/13 | ||||||
Date of Issue | 28-07-2023 | ||||||
Date of Due | 11-08-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
28) | Lighting of Friendship Fountain with LED RGB Light in front of Admin Building | ||||||
Reference No. | IITJ/OIE/2023-2024/12 | ||||||
Date of Issue | 28-07-2023 | ||||||
Date of Due | 02-08-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
29) | REWILDING WORK AT IIT JODHPUR (KARWAR) | ||||||
Reference No. | IITJ/OIE/RW/2023-24/17 | ||||||
Date of Issue | 02-07-2023 | ||||||
Date of Due | 09-08-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
30) | Providing and laying Kerb stone at various locations in IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/16A | ||||||
Date of Issue | 10-07-2023 | ||||||
Date of Due | 17-07-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
31) | Electrical work in old dining hall of IIT Jodhpur | ||||||
Reference No. | IITJ/I/2023-2024/OIE/15 | ||||||
Date of Issue | 30-06-2023 | ||||||
Date of Due | 07-07-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
32) | Consultancy Services for Feasibility Study for Construction of Buildings on Public Private Partnership (PPP) Model | ||||||
Reference No. | IITJ/I/OIE/2023-24/14 | ||||||
Date of Issue | 24-06-2023 | ||||||
Date of Due | 25-07-2023 | ||||||
Corrigendum |
|
||||||
Award | PPP Bid Evaluation Sheet | ||||||
33) | Cleaning of Ducts and Maintenance Work of exhaust system installed at New and Old dining hall, IIT Jodhpur | ||||||
Reference No. | IITJ/I/OIE/2023-24/13 | ||||||
Date of Issue | 15-06-2023 | ||||||
Date of Due | 22-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
34) | Making electrical supply provision for Tea Corner (near LHB), Pedestal Gate (Near AIDS Building), and street light along with associated electrical work for last street of Type-B Housing | ||||||
Reference No. | IITJ/I/OIE/2023-24/12 | ||||||
Date of Issue | 05-06-2023 | ||||||
Date of Due | 12-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
35) | Cleaning of Ducts and Maintenance Work of exhaust system installed at New and Old dining hall, IIT Jodhpur. | ||||||
Reference No. | IITJ/I/OIE/2023-24/11 | ||||||
Date of Issue | 30-05-2023 | ||||||
Date of Due | 06-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
36) | Providing and Fixing of Stainless-Steel Grills at Hostels, IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/10 | ||||||
Date of Issue | 25-05-2023 | ||||||
Date of Due | 15-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
37) | Providing and Filling of local earth behind berms at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2023-24/09 | ||||||
Date of Issue | 25-05-2023 | ||||||
Date of Due | 01-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
38) | Repairing work at DWTS plant and WTP plant, IIT Jodhpur | ||||||
Reference No. | IITJ/I/OIE/2023-24/07 | ||||||
Date of Issue | 04-05-2023 | ||||||
Date of Due | 11-05-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
39) | Providing Telecom/Mobile Network Solution for IIT Jodhpur Campus | ||||||
Reference No. | IITJ/I/OIE/2023-24/06 | ||||||
Date of Issue | 02-05-2023 | ||||||
Date of Due | 23-05-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
40) | Procurement of UPS battery for Phase-1 Building | ||||||
Reference No. | IITJ/I/OIE/2023-24/05 | ||||||
Date of Issue | 02-05-2023 | ||||||
Date of Due | 23-05-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
41) | Development of Audio and Video Recording Studios at IIT Jodhpur | ||||||
Reference No. | IITJ/I/OIE/2023-24/04 | ||||||
Date of Issue | 02-05-2023 | ||||||
Date of Due | 30-06-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
42) | Supplying and installation of 4.0 TR Tower AC at Sever Room, Library Building, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2023-24/01 | ||||||
Date of Issue | 10-04-2023 | ||||||
Date of Due | 17-04-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
43) | Development of Audio and Video Recording Studios at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/97 | ||||||
Date of Issue | 30-03-2023 | ||||||
Date of Due | 20-04-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
44) | Minor Repair Work at HVAC Plant, IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/95 | ||||||
Date of Issue | 22-03-2023 | ||||||
Date of Due | 29-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
45) | Supply and laying of electrical cable for existing flood lights at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/94 | ||||||
Date of Issue | 10-03-2023 | ||||||
Date of Due | 17-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
46) | Providing Telecom Mobile Network Solution for IIT Jodhpur Campus | ||||||
Reference No. | IITJ/OIE/2022-23/93 | ||||||
Date of Issue | 10-03-2023 | ||||||
Date of Due | 20-04-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
47) | Providing Power Supply and associated Electrical Installation Work at Gate No.2 IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/92 | ||||||
Date of Issue | 10-03-2023 | ||||||
Date of Due | 31-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
48) | Supplying and installation of 4.0 TR Tower AC at Sever Room, Library Building, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/90 | ||||||
Date of Issue | 06-03-2023 | ||||||
Date of Due | 13-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
49) | Providing and laying paver block in back side of Jodhpur Club at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/87 | ||||||
Date of Issue | 28-02-2023 | ||||||
Date of Due | 09-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
50) | Construction of Shed in Pocket B, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/85 | ||||||
Date of Issue | 21-02-2023 | ||||||
Date of Due | 28-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
51) | Signage work at various locations, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/84 | ||||||
Date of Issue | 21-02-2023 | ||||||
Date of Due | 28-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
52) | Electrical Installation work at Pocket C, E14(BERM), W13 and E7 IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/83 | ||||||
Date of Issue | 18-02-2023 | ||||||
Date of Due | 25-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
53) | Development of Swale with Stone Pitching from B4 Hostel to Berm Road | ||||||
Reference No. | IITJ/OIE/2022-23/81 | ||||||
Date of Issue | 14-02-2023 | ||||||
Date of Due | 09-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
54) | Providing and laying paver block in front of community centre and for parking near infra gate | ||||||
Reference No. | IITJ/OIE/2022-23/80 | ||||||
Date of Issue | 14-02-2023 | ||||||
Date of Due | 09-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
55) | Aluminium Partition Work for Chemistry Lab No. 316 at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/79 | ||||||
Date of Issue | 11-02-2023 | ||||||
Date of Due | 18-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
56) | Electrical Installation work at Pocket C, E14(BERM), W13 and E7 IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/78 | ||||||
Date of Issue | 11-02-2023 | ||||||
Date of Due | 18-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
57) | Procurement of 1 set (2 nos.) 3/4 inch of various length double braided SS-304 flexible connector for Hi Wall AC at various hostels at IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/77 | ||||||
Date of Issue | 11-02-2023 | ||||||
Date of Due | 04-03-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
58) | Minor Repair Work at HVAC Plant, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/76 | ||||||
Date of Issue | 09-02-2023 | ||||||
Date of Due | 16-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
59) | Construction of RCC Box culvert on boundary wall road near CPWD office, IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/75 | ||||||
Date of Issue | 08-02-2023 | ||||||
Date of Due | 15-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
60) | Minor Repair Work at HVAC Plant, IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/74 | ||||||
Date of Issue | 09-02-2023 | ||||||
Date of Due | 16-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
61) | Supply, Installation, Testing and Commissioning of LED Flood Light near back side of BERM, IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/73 | ||||||
Date of Issue | 07-02-2023 | ||||||
Date of Due | 14-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
62) | Design and Construction of One Block of 3D printed studio apartment including all allied services at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/72 | ||||||
Date of Issue | 06-02-2023 | ||||||
Date of Due | 27-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
63) | Alteration and Modification Work at Porta Cabin, Mathematics Department, IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/71 | ||||||
Date of Issue | 06-02-2023 | ||||||
Date of Due | 13-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
64) | Supply, Installation, Commissioning and Testing of 30.5 Meter Flag Mast at Indian Institute of Technology Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/69 | ||||||
Date of Issue | 23-01-2023 | ||||||
Date of Due | 30-01-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
65) | Supply, Installation, Testing and Commissioning of Facade lighting in three sides of clock tower and front side of Jnan Chandra Ghosh Building, Computer center and main gate of IIT Jodhpur Campus. | ||||||
Reference No. | IITJ/OIE/2022-23/66 | ||||||
Date of Issue | 20-01-2023 | ||||||
Date of Due | 10-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
66) | Design and Construction of One Block of 3D printed studio apartment including all allied services at IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/2022-23/64 | ||||||
Date of Issue | 11-01-2023 | ||||||
Date of Due | 01-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
67) | Laying of alternate water supply line (HDPE) from trench near WTP to Tunnel near Gate No. 11 | ||||||
Reference No. | IITJ/OIE/2022-23/63 | ||||||
Date of Issue | 11-01-2023 | ||||||
Date of Due | 01-02-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
68) | Providing, Installation, Testing and Commissioning of Power Amplifier in Room No. 110 in Lecture Hall Building of IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/AV/57 | ||||||
Date of Issue | 03-01-2023 | ||||||
Date of Due | 13-01-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
69) | Maintenance of Horticulture Activities for Indian Institute of Technology Jodhpur (IITJ), Karwar (Pin code- 342030), NH-62, Jodhpur, Rajasthan during 2022-23 (for 1 year). | ||||||
Reference No. | IITJ/OIE/2022-23/56 | ||||||
Date of Issue | 23-12-2022 | ||||||
Date of Due | 13-01-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
70) | Making electrical supply provision for Main Gate Pocket B at IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/2022-23/53 | ||||||
Date of Issue | 19-12-2022 | ||||||
Date of Due | 09-01-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
71) | Design, Construction, Supply, Commissioning and Validation of Class-100, Class-1000, Class-10,000 and Class-1,00,000 Clean Rooms (AIoT Fab) and its Service Building at Pocket B of IIT Jodhpur, Karwar, NH-62, Nagaur Road, Jodhpur, Rajasthan | ||||||
Reference No. | IITJ/OIE/2022-23/50 | ||||||
Date of Issue | 02-12-2022 | ||||||
Date of Due | 23-01-2023 | ||||||
Corrigendum |
|
||||||
Award | |||||||
72) | Development of Senate Room at Admin Building (West) Ground Floor. | ||||||
Reference No. | IITJ/OIE/2022-23/49 | ||||||
Date of Issue | 02-12-2022 | ||||||
Date of Due | 23-12-2022 | ||||||
Corrigendum |
|
||||||
Award | |||||||
73) | Providing, Fixing, connecting and commissioning of Power Points with switch and socket, I/o Switch, Network connections on existing Modular Furniture in student room no. 209, 210, 211, 212, 223, 224, 225 & 226 at Chemistry Block & 309, 310, 311, 312, 323, 324, 325 & 326 at Bioscience Block, PhD Student room of H.S.S. and Room no. 217, 202 and 222 at CSE Department at Basic Block of Academic area Campus of IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/TENDER/18-19/03 | ||||||
Date of Issue | 01-11-2019 | ||||||
Date of Due | 29-11-2019 | ||||||
Corrigendum |
|
||||||
Award | |||||||
74) | Supply and Installation of Water Coolers and Water Purifier at Administration Building (East and West Block) Block, CSE, Chemistry and Basic Lab Building of PC of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/TENDER/18-19/02 | ||||||
Date of Issue | 30-07-2019 | ||||||
Date of Due | 20-08-2019 | ||||||
Corrigendum |
|
||||||
Award | |||||||
75) | Providing, Fixing, Connecting and Commissioning of separate chemical earthing for Room No. 105, 209 and 211 at Electrical Engineering Building of PC of IIT Jodhpur. | ||||||
Reference No. | IITJ/OIE/TENDER/18-19/01 | ||||||
Date of Issue | 08-07-2019 | ||||||
Date of Due | 15-07-2019 | ||||||
Corrigendum |
|
||||||
Award | |||||||
76) | Serviceability and checking of all air-conditioning units at all locations of the Institute including Academic, Hostel and Residential area Campus of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/TENDER/16-17/03 | ||||||
Date of Issue | 12-05-2016 | ||||||
Date of Due | 18-05-2016 | ||||||
Corrigendum |
|
||||||
Award | |||||||
77) | Providing, Fixing, Connecting and commissioning of 3 phase incoming and outgoing power outlets for connection of 30 KVA UPS in Microsystems and Microfabrication Laboratory Porta Cabin R.No. 4006 along with 3 Phase and single phase wiring in Academic Campus of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/TENDER/16-17/02 | ||||||
Date of Issue | 26-04-2016 | ||||||
Date of Due | 02-05-2016 | ||||||
Corrigendum |
|
||||||
Award | |||||||
78) | Serviceability and checking of all air-conditioning units at all locations of the Institute including Academic, Hostel and Residential area Campus of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/TENDER/16-17/01 | ||||||
Date of Issue | 04-04-2016 | ||||||
Date of Due | 11-04-2016 | ||||||
Corrigendum |
|
||||||
Award | |||||||
79) | Construction of Two Temporary Shade over Panels for Installation of DG Set near Transformers at Academic Campus of IIT Jodhpur Campus | ||||||
Reference No. | IITJ/OIE/TENDER/15-16/03 | ||||||
Date of Issue | 27-08-2015 | ||||||
Date of Due | 04-09-2015 | ||||||
Corrigendum |
|
||||||
Award | |||||||
80) | Providing, Installation, Connecting, Testing & Commissioning of Modular plug point, Power point, internet point and AC socket in R.No. 2008 in Porta cabin of Academic Campus of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/TENDER/15-16/02 | ||||||
Date of Issue | 05-08-2015 | ||||||
Date of Due | 14-08-2015 | ||||||
Corrigendum |
|
||||||
Award | |||||||
81) | Installation, Connecting, Testing and Commissioning of 15 KVA UPS along with providing TPMCB, plug point, power points and wiring of said power outletsin R.No. 3111, Account section and some other rooms of administrative building along with 3 HP monoblok pump in academic campus of IIT Jodhpur | ||||||
Reference No. | IITJ/OIE/15-16/01 | ||||||
Date of Issue | 05-08-2015 | ||||||
Date of Due | 14-08-2015 | ||||||
Corrigendum |
|
||||||
Award | |||||||
82) | Construction of Badminton Court, Basketball Court and Cafeteria in BSNL Subhash Nagar Colony, Campus. | ||||||
Reference No. | IITJ/IWD/TENDER/14-15/06 | ||||||
Date of Issue | 31-10-2014 | ||||||
Date of Due | 21-11-2014 | ||||||
Corrigendum |
|
||||||
Award | |||||||
83) | Providing, Installation, Connecting, Testing and Commissioning of flood lighting fixtures along with armoured cable in eastern side of Boundary wall, administrative block, front of academic block-II and MT Section / parking in academic campus of IIT Jodhpur | ||||||
Reference No. | IITJ/IWD/TENDER/14-15/05 | ||||||
Date of Issue | 31-10-2014 | ||||||
Date of Due | 07-11-2014 | ||||||
Corrigendum |
|
||||||
Award | |||||||
84) | Providing of electrical connection through UPS for squid, PPMS and Scanning Paneling Microscope machine installation along with single and three phase power supply for installation of chiller and compressor in physics lab R.No. 1102 and R.No. 5008 Porta Cabin in Academic Campus of IIT Jodhpur. | ||||||
Reference No. | IITJ/IWD/TENDER/14-15/04 | ||||||
Date of Issue | 23-09-2014 | ||||||
Date of Due | 30-09-2014 | ||||||
Corrigendum |
|
||||||
Award | |||||||
Vendors interested in undertaking the construction are invited to quote for the same.